Plastic hose manufacturer wholesale _ cosmetic plastic hose _PET plastic hose _PVC plastic hose PE plastic hose factory direct sale
by:Lisson
2021-01-12
Processing and manufacturing of the product has its production cycle.
Most of the processing customized products, packaging and printing industry packaging printing and packaging, packing and so on.
Plastic hose is one of the cosmetics packaging material.
Plastic hose production cycle, need to know its processing technology to understand, why this period of time.
Plastic hose production cycle, from the moment of production under the single.
Production orders after, the first thing to do is, the material of different plastic hose to open a new mould, whether single QiangMo, or double QiangMo or PET material, PE material, a new set of mold out, about 15 ~ 20 days or so.
Mould finish, for production, if it is plastic injection -
Extrusion blow -
Screen printing -
Forming the craft, soft tube of plastic hose capacity is 500 ml, the daily output of a machine is 5000, workshop of blowing machine up to 6 ~ 10 sets, combined daily output is 30000 ~ 50000.
Orders for tens of thousands of customers, and then open two sets of machine, basically can finish a day.
The plastic hose is injection molding - process
Pull a blow -
Screen printing -
Molding process, the time will be a little short, blow mould, injection moulding into tube embryo, after blowing machine heating blow molding, relative to the crowded blowing, speed faster, output of thousands of, basically a machine can be completed.
After these process will be soft pipe produced, is not complete, tens of thousands of production of soft tubes, and screen printing, hot stamping process, it is in the hose body will design through the film, drying good net edition and printing on the hose, screen printing is a mechanical operation, the number of tens of thousands of basically also want a day or so.
If you have hot stamping process, the soft pipe is hot stamping machine, by artificial bronzing them one by one.
Artificial bronzing time about two or three days.
If these are complete, hairy PE material, soft pipe and to independent shrink-wrapped, again big plastic bags by the number of 180 ~ 200, coat woven bag.
Artificial packaging time 1 ~ 2 days.
The plastic hose production cycle count down nearly 25 ~ 30 days or so, if you have ready-made mould doesn't open mold, plastic hose and production cycle is halved, more quickly.