Injection cosmetics cosmetics packaging hose production mold after installed, must go through idle running inspection, in order to found the problem further, thus solve the problem.
1. Soft hose cosmetics packaging production mold injection molding cosmetic slowly close, after spotting the joint surface shall be closely contact, may not be a gap.
2. When open mold ejection stripper should guarantee the smooth demoulding, in order to take out the plastic parts and gating system waste.
3. Activity core and ejector and guiding parts should be smooth sliding movement, flexible and reliable action coordination.
4. Check the locking mechanism, should be able to reliably and safely lock, all the fasteners shall not have any loose phenomenon.
5. The pneumatic, hydraulic control system should be correct, do not leak, do not produce too much vibration, the valve is working properly.
6. Cooling system of the waterways are clear, no leakage, all sorts of control valves should be controlled properly.
1. Soft hose cosmetics packaging production mold injection molding cosmetic slowly close, after spotting the joint surface shall be closely contact, may not be a gap.
2. When open mold ejection stripper should guarantee the smooth demoulding, in order to take out the plastic parts and gating system waste.
3. Activity core and ejector and guiding parts should be smooth sliding movement, flexible and reliable action coordination.
4. Check the locking mechanism, should be able to reliably and safely lock, all the fasteners shall not have any loose phenomenon.
5. The pneumatic, hydraulic control system should be correct, do not leak, do not produce too much vibration, the valve is working properly.
6. Cooling system of the waterways are clear, no leakage, all sorts of control valves should be controlled properly.