Cosmetics packaging production machine safety operation specification necessary knowledge
by:Lisson
2020-11-18
<
1 >
Per shift boot before, it is necessary to add the lubricating oil in the moving parts.
(
Robots, robot guide, opening and closing mould guide)
< 2 > can swing arm ( 3 - 4) Add a days. Heating machine big chain, small chain can be once a month. Often, heating machine, check the host reducer reducer is short of oil. The host bearing can be ( 2 - 3) Plus one times a month.
< 3 > check all moving parts are in strong before production, if the screw loose fall off, especially the impact force strong, belt drive part.
< 4 > check the high pressure gas source, low pressure air supply, power supply, water supply is normal.
< 5 > check the abrupt stop switch, safety door switch, protection device detection switch is normal.
< 6 > check heating head into the embryo, embryo parts work is normal. Insert embryo does not reach the designated position adjustable nut pressing device.
< 7 > check whether the tube is damaged, the fracture. To timely replacement. 8 >
< check all pneumatic components are in a flat, action is sensitive.
( 9) Check whether the triplet is abnormal leakage, blockage, water cup water is too full. >
< 10 cosmetics packaging production of mechanical and electronic magnetic valve when the weather is abnormal, should be timely cleaning < every cosmetics packaging production 3. 5 million cleaning >.
< 11 > cosmetics packaging production mold must be regular cleaning, polishing.
< 12 > when you start the high and low pressure gas source switch must be slow action, to prevent air supply velocity of fast dirt into the solenoid valve, at the same time open the exhaust valve for 30 seconds, ensure that the air is clean.
< 13 > must be sure that when the machine starts good mechanical part, machine inside no one, no foreign body. Especially the crank position, so as not to hurt. Close the security at the same time.
< > 14 when starting the machine must first start the motor, 30 seconds delay start heating machine, in case of voltage fluctuation. Sure didn't open the cooling water before you start heating.
< 15 > heating start ( 2 - 3) Minutes later, wait for drying oven temperature rise even in embryo button. Cosmetics packaging production to electricity will open at the same time, otherwise is not cosmetics packaging production.
< 16 > machine must pay close attention to whether the machine has abnormal noise, when to do early detection, timely stop early.
< 17 > in case of emergency, press stop button, emergency brake. Then according to the causes of the formation of the situation analysis, find the problem quickly resolved.
( 1 8) After machine run properly, any parts of the body do not avoid manipulator into machine cuts. After such as machine has sound can slow down.
( 1, 9) Machine after normal production, the operator must always observe cosmetics packaging production quality, in order to avoid the voltage fluctuation affects the quality of cosmetics packaging production or other reasons.
( 2, 0) Machine maintenance, breakdown maintenance by touch screen button, in order to ensure safety maintenance.
as observed manually separate each cavity of the action, please pay attention to the position of the manipulator. At the same time, be sure to clearly separate the role of the button, then the action. Ensure that misoperation cause unnecessary trouble.
( 2 (1) After each maintenance to the machine, be sure to clean up things such as tools and screw, in order to avoid legacy in the machine, affect the normal operation of the machine.
< 2 > can swing arm ( 3 - 4) Add a days. Heating machine big chain, small chain can be once a month. Often, heating machine, check the host reducer reducer is short of oil. The host bearing can be ( 2 - 3) Plus one times a month.
< 3 > check all moving parts are in strong before production, if the screw loose fall off, especially the impact force strong, belt drive part.
< 4 > check the high pressure gas source, low pressure air supply, power supply, water supply is normal.
< 5 > check the abrupt stop switch, safety door switch, protection device detection switch is normal.
< 6 > check heating head into the embryo, embryo parts work is normal. Insert embryo does not reach the designated position adjustable nut pressing device.
< 7 > check whether the tube is damaged, the fracture. To timely replacement. 8 >
< check all pneumatic components are in a flat, action is sensitive.
( 9) Check whether the triplet is abnormal leakage, blockage, water cup water is too full. >
< 10 cosmetics packaging production of mechanical and electronic magnetic valve when the weather is abnormal, should be timely cleaning < every cosmetics packaging production 3. 5 million cleaning >.
< 11 > cosmetics packaging production mold must be regular cleaning, polishing.
< 12 > when you start the high and low pressure gas source switch must be slow action, to prevent air supply velocity of fast dirt into the solenoid valve, at the same time open the exhaust valve for 30 seconds, ensure that the air is clean.
< 13 > must be sure that when the machine starts good mechanical part, machine inside no one, no foreign body. Especially the crank position, so as not to hurt. Close the security at the same time.
< > 14 when starting the machine must first start the motor, 30 seconds delay start heating machine, in case of voltage fluctuation. Sure didn't open the cooling water before you start heating.
< 15 > heating start ( 2 - 3) Minutes later, wait for drying oven temperature rise even in embryo button. Cosmetics packaging production to electricity will open at the same time, otherwise is not cosmetics packaging production.
< 16 > machine must pay close attention to whether the machine has abnormal noise, when to do early detection, timely stop early.
< 17 > in case of emergency, press stop button, emergency brake. Then according to the causes of the formation of the situation analysis, find the problem quickly resolved.
( 1 8) After machine run properly, any parts of the body do not avoid manipulator into machine cuts. After such as machine has sound can slow down.
( 1, 9) Machine after normal production, the operator must always observe cosmetics packaging production quality, in order to avoid the voltage fluctuation affects the quality of cosmetics packaging production or other reasons.
( 2, 0) Machine maintenance, breakdown maintenance by touch screen button, in order to ensure safety maintenance.
as observed manually separate each cavity of the action, please pay attention to the position of the manipulator. At the same time, be sure to clearly separate the role of the button, then the action. Ensure that misoperation cause unnecessary trouble.
( 2 (1) After each maintenance to the machine, be sure to clean up things such as tools and screw, in order to avoid legacy in the machine, affect the normal operation of the machine.
Custom message